Road Maintenance and Snow Clearing
It is the intent of the District of Logan Lake to maintain the downtown mall area, streets, sidewalks and pathways within the District of Logan Lake in a safe and passable manner at a reasonable cost to the taxpayer and therefore the following policy shall be implemented:
Removal of Snow
Streets:
- Weekdays - plowed when snowfall exceeds 75mm (3 inches)
- Weekends - plowed when snowfall exceeds 100mm (4 inches)
Mall Area:
- Weekdays - plowed when snowfall exceeds 75mm (3 inches)
- Saturday - plowed when snowfall exceeds 100mm (4 inches)
NOT PLOWED ON SUNDAYS
Sidewalks:
- Sidewalks are plowed when snowfall exceeds 75mm (3 inches)
- Plowed on weekends when snowfall exceeds 75mm (3 inches)
Walkways:
- Walkways are cleared when snowfall exceeds 100mm (4 inches)
NOT PLOWED ON WEEKENDS
All above snow removal procedures will be done according to the outlined priority list below.
|
PRIORITIES #1 (b) Major Roads
Collector Roads and Hills
|
#3 Minor Roads & Recreation Centre #4 Cul-de-sacs and dead-ends #5
|
Sidewalk/Walkway Priorities
- Inner Mall Walkway and Surrounding Sidewalks(including District office)
- Galena Sidewalk
- Opal Sidewalk
- Chartrand Sidewalk
- Elementary School Walkway
- Truck and Shovel Walkway
- Jasper Sidewalk
- Topaz Sidewalk
- Ponderosa Sidewalk
- Poplar Sidewalk
- Ponderosa Walkway
- Lower Trailer Court Walkway
- Peridot Sidewalk
- Topaz/Alder Apartment Walkway
- Lake Walkway
- Chartrand/Emerald Walkway
- Beryl Walkway - Top and Bottom
- Birch/High School Walkway
- Copper Court Walkway
- Cemetery Walkway
- Cenotaph Sidewalk





